5376 and three sisters grind through Sedalia in March of 1978. They're at the head of a long #165 and will be on Santa Fe trackage until reaching Spruce. The beginning of Santa Fe trackage is marked by the pole line that crosses over the train several car
Detailed Description:
5376 and three sisters grind through Sedalia in March of 1978. They're at the head of a long #165 and will be on Santa Fe trackage until reaching Spruce. The beginning of Santa Fe trackage is marked by the pole line that crosses over the train several cars back.